Performed a procedural troubleshooting on the alternator, and replaced the AVR brushes to restore power output from the generator.
Message Business
Installed the AVR, with a manual change-over switch. This ensured protection of Plant pumps against power surges.
Message Business
Integrated the ATS panel with the generator's DSE 7320 controller. Safe change-over automatic mechanism was fully achieved.
Message Business
Conducted a comprehensive survey on the smartGen controller and its logged data in order to achieve a full service inspection and reliability check.
Message Business
Guaranteed End-to-end installation, servicing and maintenance routines for commercial and residential AC systems.
Message Business
Replaced the line CTs and fully calibrated the digital controller to fully restore utility power.
Message Business
Installed an automatic change-over switch for the AVR. Ensured that incase of cut in clean power output, System automatically switches to raw power for continued supply.
Message Business
Installed a centralized water pump panel. Later automated the system to have the pumps turned on and off automatically based on the tank levels.
Message Business
Installed line CTs and configured the digital meter to give voltage, current and kWh reading to monitor utility consumption.
Message Business
Ensured equal distribution of loads across all the 3 phases to avoid voltage drops and cable overheating.
Message Business
Replaced the batteries on the unit. Serviced the inverter and performed a power back-up test. Also installed a manual change-over switch.
Message Business
Installed pedestal sockets, floor trunkings and network modules, on every desk. This is to ensure clean cable management and safety.
Message Business
Installed power to the control panel. Calibrated the pressure switch. Later on troubleshoot and fix a tripping motor protector.
Message Business
Replaced the 'SLOW' mode button and emergency stop button. Tested mixer to ensure the mechanism produces sufficient torque
Message Business
Serviced both the indoor and outdoor units of the air conditioning systems. Tested the R22a suction pressure to ensure the system is well charged.
Message Business
Troubleshoot errors on the intelligence module. Repair one of the power modules, tested all battery modules. System fully restored.
Message Business
Performed neat trunking architecture for the x-ray room, after proper shielding. Provided sub-main power for the x-ray Machine and installed the isolator.
Message Business